Customization: | Available |
---|---|
Type: | Reverse Osmosis |
Usage: | Environmental Protection |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Leineng oil/gas fired boiler adopts horizontal three-pass wet-back structure,large corrugated furnace and patented thread pipe technology,equipped with international first-level brand burners and valve groups,and independently developed high-matching PLC control system to realize muitiple linkages.The lock protection function protects the equipment running safely.
Model
|
Water Making Ability
|
Inlet Caliber
|
Effluent Caliber
|
Blowdown alCer
|
Size(mm)
|
Power
|
YSRO-0.5T
|
0.5m3/h
|
DN20
|
DN20
|
DN15
|
1500×600×1500
|
1.3kw
|
YSRO-1T
|
1m3/h
|
DN25
|
DN25
|
DN20
|
1700×600×1500
|
2.1kw
|
YSRO-2T
|
2m3/h
|
DN32
|
DN25
|
DN20
|
2500×1000×1950
|
4.4kw
|
YSRO-3T
|
3m3/h
|
DN40
|
DN32
|
DN25
|
2500×1200×2150
|
4.5kw
|
YSRO-5T
|
5m3/h
|
DN50
|
DN40
|
DN32
|
2500×1350×2150
|
7.0kw
|
YSRO-8T
|
8m3/h
|
DN50
|
DN50
|
DN40
|
3500×1500×2150
|
11kw
|
YSRO-10T
|
10m3/h
|
DN50
|
DN50
|
DN40
|
3500×1600×2300
|
15kw
|
LeiNeng Boiler Co., Ltd, founded in 2020, is a modern high-tech enterprise integrating boiler research and development, design, manufacture, sales, installation and after-sales service. The company is located in Zhengzhou City, Henan Province, China, with superior geographical location and convenient transportation, and owns a modern production base covering an area of 500,000 square meters, which is one of the leading companies in the boiler industry in China.
1.What is the basic principle of coal-fired steam boiler?
Coal-fired steam boilers use coal as fuel to heat water through high-temperature flue gas generated by combustion, so that water is heated and evaporated in a closed boiler and converted into steam.This process includes the combustion of coal, the transfer of heat, the vaporization of water and the collection of steam, which is the process of converting heat energy into steam energy.